Chapter 12.04 SIDEWALK AND CURB CONSTRUCTION

Section 12.04.180 Same--Finishing and scoring of sidewalk section.
The sidewalk section of the driveway approach shall be finished and scored as
specified by the
director of public works for typical sidewalk construction. Apron and end slope areas of the
driveway approach shall be finished, after trowelling smooth and scoring, with a fibre push broom
drawn over the surface parallel to the curb line. (Ord. 165 (part), 2000: prior code § 12.02.250)