Section 12.04.190 Same--Where concrete sidewalks have not been installed.
Where standard gutters and curbs have been installed but concrete sidewalks
have not been, the
permit may authorize the applicant to construct the driveway approach from the curb line to the
applicant's premises of the same materials as those used for paving applicant's premises. The
driveway approach shall be constructed to established grade and shall be adequate and suitable for
the traffic to be carried by it. The permit shall provide, and the applicant shall agree, that if and
when thereafter concrete sidewalks are constructed, the applicant or his/her successor shall install
concrete driveway approaches. (Ord. 165 (part), 2000: prior code § 12.02.251)