Section 12.08.030 Applications--Contents--Conditions--Notice.
Applications shall be made to the public works director stating the purpose
of which such
excavation is to be made, including location, depth, width, length, and amount of time such
excavation is to remain open or unfilled. Applicant shall file upon request, with the public works
director for approval, one drawing of all proposed improvements before permit is issued. A permit
shall expire by limitation and become null and void if work authorized is not commenced within
fifteen (15) days after date of issuance. Before work is recommenced, a new permit shall be issued
and a full permit fee paid. Extension of time on permits shall be in writing by the public works
director or agent. Permittee shall give the public works director or designated agent one day's notice
of beginning excavation and four hours notice of commencing backfill. No excavation shall extend
over half the width of any street right-of-way section at any time, except under written authorization
the public works director or designated agent. (Ord. 155 (part), 1999: prior code § 12.03.030)