Section 12.08.130 Comprehensive development plan.
A. Each utility company within the city shall provide
a comprehensive plan for the use of the
public rights-of-way or easements for public utilities. The utility company shall provide the public
works director with a minimum of two copies of the plan. The plan shall be a five year type plan
plus information regarding long range plans. The plan shall be submitted prior to July 1, 1982.
Supplemental updates of the plan shall be provided each year prior to January 1st of each year. The
plan and yearly supplements shall contain but shall not be limited to the following:
1. Master plan of the utility in the public right-of-way
or easement;
2. Reconstruction, extension or replacement plans;
3. Yearly program for construction planned;
4. Schedules of overall improvements;
5. Location of the proposed improvements within the public
right-of-way.
B. Each utility company operating in the city shall be
governed as to backfill and surface
restoration by the provisions of the above sections. It is the intention of this section to recognize
the
special requirements for the continual maintenance of service of electric, water, telephone, gas, and
heating system utilities and to permit such utilities to operate in a reasonable manner as to the
making of excavations necessary to restore or maintain their services. (Ord. 155 (part), 1999: prior
code § 12.03.130)